SC
Scope Beta 1
Metis Construction
Jay Agaev
PDF preview
Metis Construction
CA Lic. 1029669 • remodel@metisconst.com • 510-681-0855
Sofia Ramirez
1842 Rose Garden Ct, Walnut Creek, CA
We are proposing a full primary bathroom renovation focused on durable tile surfaces, electric floor warming, and a clean updated vanity installation tailored to the existing room footprint.
Full primary bathroom demolition and haul-away
1
lump sum
$1,450
$1,450
Stacked shower tile installation with one niche
82
sq ft
$36
$2,952
Electric heated floor underlayment
82
sq ft
$19
$1,558
60 inch floating vanity installation
1
each
$820
$820
Grand total
$6,780